Real C_TS4CO_2020 dumps Accurate Questions and Answers with Free and Fast Updates [Q71-Q92]

Share

Real C_TS4CO_2020 dumps Accurate Questions and Answers with Free and Fast Updates

Real C_TS4CO_2020 Quesions Pass Certification Exams Easily

NEW QUESTION 71
You want to settle primary cost elements and secondary cost elements to different receivers. What do you use?

  • A. Allocation structure
  • B. Overhead structure
  • C. Source structure
  • D. PA transfer structure

Answer: C

 

NEW QUESTION 72
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.

  • A. Costing sheet
  • B. Price updates
  • C. Price for materials
  • D. Save with date key

Answer: B,D

 

NEW QUESTION 73
You need to analyze different planning scenarios for cost centers. With which object do you differentiate the planning scenarios?

  • A. CO version
  • B. Operating concern
  • C. Cost center group
  • D. Company code

Answer: A

 

NEW QUESTION 74
You want to set up budget availability control for your projects and internal ordders. What can you check using budget availability control? 2 Answers

  • A. The availability of funds using overall plan value
  • B. The availability of funds on period level
  • C. The availability of funds in object currency
  • D. The availability of funds according to tolerance limits

Answer: C,D

 

NEW QUESTION 75
How can you configure the transfer price solution in SAP S4/HANA? 2 Answers

  • A. Use separate accounts for each valuation
  • B. Use separate currency types within the same ledger for each valuation
  • C. Use separate ledgers for each valuation
  • D. Use separate segments for each valuation

Answer: A,C

 

NEW QUESTION 76
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.

  • A. Strategy group -> planning strategy -> requirements class -> requirements type
  • B. MRP group -> requirements class -> planning strategy -> requirements type
  • C. MRP group -> Strategy group -> planning strategy -> requirements type
  • D. Strategy group -> planning strategy -> requirements type

Answer: C,D

 

NEW QUESTION 77
Which Customizing for Document Splitting settings do you maintain to ensure that financia statements can always be produced separately for each profit center?

  • A. Zero-balance
  • B. Dummy profit center
  • C. Inheritance
  • D. Standard account assignment

Answer: D

 

NEW QUESTION 78
To which object do you settle values of the result analysis ?

  • A. Profitability segment
  • B. Cost center
  • C. Segment
  • D. Profit Center

Answer: A,B

 

NEW QUESTION 79
Which component provides insight into the effectiveness and results for areas of responsibility within the enterprise?

  • A. Profit center accounting
  • B. Revenue accounting and reporting
  • C. Results analysis
  • D. Profitability analysis

Answer: A

 

NEW QUESTION 80
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirement must be fulfilled ? 2 Answers

  • A. Costing-based Profitability Analysis must be active
  • B. The type of the corresponding general ledger must be primary cost/revenue or secondary cost
  • C. Account-based profitability must be active.
  • D. The type of the corresponding general ledger must be balance sheet

Answer: B,D

 

NEW QUESTION 81
When you create a profit center, what company code(s) is it assigned to by default ?

  • A. All company codes within the controlling area
  • B. All company codes within the operating concern
  • C. All company codes where profit center is activated
  • D. All company codes, irrespective of controlling area

Answer: A

 

NEW QUESTION 82
Which are mandatory attributes, when you create an operating concern with costing-based and account-based CO-PA? There are TWO correct answers for this question

  • A. Company code currency in costing-based CO-PA
  • B. Fiscal year variant
  • C. Second period type
  • D. Operating Concern Currency

Answer: B,D

 

NEW QUESTION 83
What can you specify when you create an activity type? There are THREE correct answers for this question

  • A. The valid sending cost center types
  • B. The activity type category for allocation
  • C. The primary costs G/L account for internal activity allocation
  • D. The valid receiving cost center types
  • E. The secondary costs G/L account for internal activity allocation

Answer: A,B,E

 

NEW QUESTION 84
How can you configure cycles for period-end allocation? There are TWO correct answers for this question

  • A. Define allocation for the same cost center in multiple segments
  • B. Assign several segments to a cycle
  • C. Create cycles that iterate with each other
  • D. Use different allocation rules within one segment

Answer: A,B

 

NEW QUESTION 85
What do you do to create a primary cost component split? There are TWO correct answers for this question

  • A. Run an activity price calculation
  • B. Use the cost splitting tool on cost centers
  • C. Assign a cost component structure to the CO-version
  • D. Enter split activity prices manually

Answer: A,C

 

NEW QUESTION 86
How does SAP S4/HANA determine if a characteristic value is valid in Profitability Analysis?

  • A. By defining the characteristic value in the check table
  • B. By defining the characteristic value in the field catalog
  • C. By defining the characteristic value as a key figure
  • D. By defining the characteristic value as a value field

Answer: A

 

NEW QUESTION 87
You are creating new activity type and want to maintain plan prices for a cost center. Which attribute must you configure in the activity type master record? Note: There are 3 correct answers to this question.

  • A. Valid cost center categories
  • B. Price indicator
  • C. CO version
  • D. Activity type category
  • E. Company code

Answer: A,B,D

 

NEW QUESTION 88
Where can you find actual transaction data of account-based CO-PA in SAP S/4HANA?

  • A. BSEG
  • B. ACDOCA
  • C. CE1XXXX
  • D. COEJ

Answer: B

 

NEW QUESTION 89
How does the system derive the requirement type from the material master data ?

  • A. Strategy group -> planning strategy -> requirements class -> requirements type
  • B. MRP group -> strategy group -> planning strategy -> requirements type
  • C. MRP group requirements class -> planning strategy -> requirements type
  • D. Strategy group -> planning strategy -> requirements type

Answer: B,D

 

NEW QUESTION 90
What can you manage via the account assignment category? 2 Answers

  • A. Product cost by sales order
  • B. Costing variant
  • C. Separate sales order stock
  • D. Valuated sales order stock

Answer: B,D

 

NEW QUESTION 91
You want to creat cost centers for you company. What is the prerequisite to building an organizational structure for overhead cost controlling?

  • A. Standard hierarchy top node
  • B. Cost center category
  • C. Functional area
  • D. Cost center type

Answer: A

 

NEW QUESTION 92
......

C_TS4CO_2020 Dumps are Available for Instant Access: https://www.trainingdumps.com/C_TS4CO_2020_exam-valid-dumps.html

Practice with these C_TS4CO_2020 dumps Certification Sample Questions: https://drive.google.com/open?id=1Z1GoBAb70ioDSFnQejZd27sQ76s9zD28