NEW QUESTION 71
You want to settle primary cost elements and secondary cost elements to different receivers. What do you use?
- A. Allocation structure
- B. Overhead structure
- C. Source structure
- D. PA transfer structure
Answer: C
NEW QUESTION 72
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.
- A. Costing sheet
- B. Price updates
- C. Price for materials
- D. Save with date key
Answer: B,D
NEW QUESTION 73
You need to analyze different planning scenarios for cost centers. With which object do you differentiate the planning scenarios?
- A. CO version
- B. Operating concern
- C. Cost center group
- D. Company code
Answer: A
NEW QUESTION 74
You want to set up budget availability control for your projects and internal ordders. What can you check using budget availability control? 2 Answers
- A. The availability of funds using overall plan value
- B. The availability of funds on period level
- C. The availability of funds in object currency
- D. The availability of funds according to tolerance limits
Answer: C,D
NEW QUESTION 75
How can you configure the transfer price solution in SAP S4/HANA? 2 Answers
- A. Use separate accounts for each valuation
- B. Use separate currency types within the same ledger for each valuation
- C. Use separate ledgers for each valuation
- D. Use separate segments for each valuation
Answer: A,C
NEW QUESTION 76
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
- A. Strategy group -> planning strategy -> requirements class -> requirements type
- B. MRP group -> requirements class -> planning strategy -> requirements type
- C. MRP group -> Strategy group -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements type
Answer: C,D
NEW QUESTION 77
Which Customizing for Document Splitting settings do you maintain to ensure that financia statements can always be produced separately for each profit center?
- A. Zero-balance
- B. Dummy profit center
- C. Inheritance
- D. Standard account assignment
Answer: D
NEW QUESTION 78
To which object do you settle values of the result analysis ?
- A. Profitability segment
- B. Cost center
- C. Segment
- D. Profit Center
Answer: A,B
NEW QUESTION 79
Which component provides insight into the effectiveness and results for areas of responsibility within the enterprise?
- A. Profit center accounting
- B. Revenue accounting and reporting
- C. Results analysis
- D. Profitability analysis
Answer: A
NEW QUESTION 80
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirement must be fulfilled ? 2 Answers
- A. Costing-based Profitability Analysis must be active
- B. The type of the corresponding general ledger must be primary cost/revenue or secondary cost
- C. Account-based profitability must be active.
- D. The type of the corresponding general ledger must be balance sheet
Answer: B,D
NEW QUESTION 81
When you create a profit center, what company code(s) is it assigned to by default ?
- A. All company codes within the controlling area
- B. All company codes within the operating concern
- C. All company codes where profit center is activated
- D. All company codes, irrespective of controlling area
Answer: A
NEW QUESTION 82
Which are mandatory attributes, when you create an operating concern with costing-based and account-based CO-PA? There are TWO correct answers for this question
- A. Company code currency in costing-based CO-PA
- B. Fiscal year variant
- C. Second period type
- D. Operating Concern Currency
Answer: B,D
NEW QUESTION 83
What can you specify when you create an activity type? There are THREE correct answers for this question
- A. The valid sending cost center types
- B. The activity type category for allocation
- C. The primary costs G/L account for internal activity allocation
- D. The valid receiving cost center types
- E. The secondary costs G/L account for internal activity allocation
Answer: A,B,E
NEW QUESTION 84
How can you configure cycles for period-end allocation? There are TWO correct answers for this question
- A. Define allocation for the same cost center in multiple segments
- B. Assign several segments to a cycle
- C. Create cycles that iterate with each other
- D. Use different allocation rules within one segment
Answer: A,B
NEW QUESTION 85
What do you do to create a primary cost component split? There are TWO correct answers for this question
- A. Run an activity price calculation
- B. Use the cost splitting tool on cost centers
- C. Assign a cost component structure to the CO-version
- D. Enter split activity prices manually
Answer: A,C
NEW QUESTION 86
How does SAP S4/HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value in the check table
- B. By defining the characteristic value in the field catalog
- C. By defining the characteristic value as a key figure
- D. By defining the characteristic value as a value field
Answer: A
NEW QUESTION 87
You are creating new activity type and want to maintain plan prices for a cost center. Which attribute must you configure in the activity type master record? Note: There are 3 correct answers to this question.
- A. Valid cost center categories
- B. Price indicator
- C. CO version
- D. Activity type category
- E. Company code
Answer: A,B,D
NEW QUESTION 88
Where can you find actual transaction data of account-based CO-PA in SAP S/4HANA?
- A. BSEG
- B. ACDOCA
- C. CE1XXXX
- D. COEJ
Answer: B
NEW QUESTION 89
How does the system derive the requirement type from the material master data ?
- A. Strategy group -> planning strategy -> requirements class -> requirements type
- B. MRP group -> strategy group -> planning strategy -> requirements type
- C. MRP group requirements class -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements type
Answer: B,D
NEW QUESTION 90
What can you manage via the account assignment category? 2 Answers
- A. Product cost by sales order
- B. Costing variant
- C. Separate sales order stock
- D. Valuated sales order stock
Answer: B,D
NEW QUESTION 91
You want to creat cost centers for you company. What is the prerequisite to building an organizational structure for overhead cost controlling?
- A. Standard hierarchy top node
- B. Cost center category
- C. Functional area
- D. Cost center type
Answer: A
NEW QUESTION 92
......
C_TS4CO_2020 Dumps are Available for Instant Access: https://www.trainingdumps.com/C_TS4CO_2020_exam-valid-dumps.html