Prepare for your exam certification with our LEED-Green-Associate Certified USGBC [Q20-Q36]

Share

Prepare for your exam certification with our LEED-Green-Associate Certified USGBC

Free USGBC LEED-Green-Associate Exam 2026 Practice Materials Collection

NEW QUESTION # 20
The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

  • A. A brownfield site with no access to metro
  • B. A greenfield site with access to public transport and proximity to grocery stores
  • C. A brownfield site in a national park with car access only
  • D. A brownfield site with access to five lines of public transportation and basic services

Answer: D

Explanation:
Explanation
From a LEED perspective, a brownfield site with access to multiple lines of public transportation and basic services would be the most applicable. Brownfield sites are previously developed sites that may be contaminated with hazardous waste or pollution. Developing on these sites can help to clean up and revitalize the area. Access to public transportation reduces the need for private vehicle use, reducing carbon emissions and traffic congestion. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 21
A nine-story residential building includes 60% of the gross floor area within the project scope, Which rating system is the most appropriate for the LEED certification of this project?

  • A. LEED AP Building Design and Construction: Core and Shell Development
  • B. LEED AP Building Design and Construction. Homes and Multifamily Low-rise
  • C. LEED AP Building Design and Construction: Multifamily Midrise
  • D. LEED AP Building Design and Construction: New Construction and Major Renovation

Answer: C

Explanation:
LEED BD+C: Multifamily Midrise is the appropriate rating system for residential buildings that are four to eight stories above grade1. Since the project scope includes 60% of the gross floor area, it meets the minimum program requirement of having at least 40% of the gross floor area certified2. The other rating systems are not suitable for this project because they either apply to different building types or heights23.
Reference:
LEED rating system selection guidance | U.S. Green Building Council2
LEED v4: Building Design + Construction Guide - U.S. Green Building Council3 LEED v4 Rating Systems | USGBC-LI1


NEW QUESTION # 22
Which of the following falls under the Energy and Atmosphere credit category?

  • A. Enhanced Refrigerant Management
  • B. Interior Lighting
  • C. Cooling Tower Water Use
  • D. Heat Island Reduction

Answer: A

Explanation:
The Energy and Atmosphere (EA) category addresses the energy performance, efficiency, and renewable sources of buildings. One of the credits in this category is EA Credit: Enhanced Refrigerant Management, which aims to reduce the emissions of ozone-depleting substances and greenhouse gases from refrigeration and air-conditioning equipment. Refrigerants are substances that are used to transfer heat in cooling systems.
Some refrigerants have high global warming potential (GWP) and ozone depletion potential (ODP), which means they can contribute to climate change and damage the ozone layer if they leak or are improperly disposed of. Enhanced refrigerant management involves selecting refrigerants with low GWP and ODP, minimizing refrigerant charge size, and preventing or detecting leaks12. References: LEED v4 Green Associate Candidate Handbook1, LEED v4 BD+C Reference Guide2


NEW QUESTION # 23
LEED certification steps generally proceed in which of the following order?

  • A. Application Preparation, Project Registration, Application Review, Submission, Certification
  • B. Select LEED rating system, Submission, Application Review, Project Registration, Certification
  • C. Project Registration, Application Preparation, Submission, Application Review, Certification
  • D. Application Preparation, Application Review, Project Registration, Submission, Certification

Answer: C

Explanation:
This is the correct order of the LEED certification process for most projects1. The first step is to register the project on LEED Online and pay the registration fee2. The second step is to prepare the application by collecting and uploading the required information and documents according to the chosen rating system and credits2. The third step is to submit the application and pay the certification fee2. The fourth step is to undergo the application review by a LEED accredited third party, which may request clarifications or corrections2. The final step is to receive the certification decision and the LEED plaque and certificate2.
Life-cycle cost analysts of a new construction includes consideration of
* cost of purchasing window glazing
* cost of adding accessible parking
* cost of challenging a real estate tax assessment
* cost of subsidizing the use of public transportation
Life-cycle cost analysis (LCCA) is a method for assessing the total cost of owning a facility or running a project. It considers all the costs associated with obtaining, owning, and disposing of an investment1. The cost of purchasing window glazing is one of the initial costs that affects the energy performance and thermal comfort of a building2. Therefore, it is included in the LCCA of a new construction.
https://www.usgbc.org/credentials/leed-green-associate


NEW QUESTION # 24
At which phase should a project team begin the commissioning process?

  • A. At the start of construction
  • B. Early in the design
  • C. During permitting
  • D. After the building is operational

Answer: B


NEW QUESTION # 25
Which of the following is a strategy that can help projects meet on site sustainability goals during construction?

  • A. Implement a stormwater pollution prevention plan
  • B. Update the LEED checklist
  • C. Perform a value engineering exercise
  • D. Purchase Renewable Energy Certificates

Answer: A

Explanation:
Implementing a stormwater pollution prevention plan during construction can help projects meet on-site sustainability goals. This plan outlines measures to control runoff and prevent soil erosion, which can carry pollutants into nearby water bodies. By managing stormwater on-site, projects can protect local water quality while also recharging groundwater supplies. Reference: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 26
What is the minimum gross floor area required for a Building Design and Construction (BD+C) project to be eligible for certification?

  • A. 1000 tt2 (93 m2)
  • B. 250 ft2 (23 m2)
  • C. 750 ft2 (70 m2)
  • D. 500 ft2 (46 m2)

Answer: A

Explanation:
Explanation
The LEED minimum program requirements state that for LEED BD+C and LEED O+M rating systems, the LEED project must include a minimum of 1000 ft2 (93 m2) of gross floor area1.
References:
LEED v4: Building Design + Construction Guide
LEED minimum program requirements
LEED For Building Design And Construction (LEED BD+C) Rating Systems In Details


NEW QUESTION # 27
Energy and Atmosphere Credit encompasses

  • A. building loads, energy performance management and EQ
  • B. integrative process, building loads and EQ
  • C. building loads, energy performance management and environmental concerns
  • D. site selection, site design and environmental concerns

Answer: A


NEW QUESTION # 28
During which stage of a project is implementation of the Integrative Process most effective in improving performance?

  • A. Operation
  • B. Construction document
  • C. Construction
  • D. Early de sign

Answer: D

Explanation:
Explanation
The Integrative Process is most effective during the early design stage of a project. This is when key decisions about the project are being made that can have a significant impact on its sustainability performance. By considering sustainability objectives from the outset, teams can identify opportunities for synergies and cost savings that may not be apparent later in the project. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 29
Which of the following reflects a scorecard rule for LEED Credit Point Allocation?

  • A. Minimum of five prerequisites within each rating system
  • B. Maximum of 55 credits within each rating system
  • C. Maximum of 100 base points
  • D. Minimum of seven points per credit category

Answer: C

Explanation:
A scorecard rule for LEED Credit Point Allocation is that there is a maximum of 100 base points available for each rating system. These points are distributed among the different credit categories based on their relative contribution to the overall environmental impact and human health benefits of a project. The point allocation process is informed by a weighting methodology that uses life cycle assessment and expert judgment to assign weights to each of the LEED impact categories. The impact categories reflect the goals and priorities of LEED, such as reversing climate change, enhancing human health, protecting water resources, and promoting social equity. References: LEED v4 Impact Category and Point Allocation Process Overview1; LEED scorecard5


NEW QUESTION # 30
Which permanently installed building products are addressed in the Materials and Resources Credit category calculation?

  • A. Elevators
  • B. Process equipment
  • C. Formwork for concrete
  • D. Framing

Answer: D

Explanation:
The Materials and Resources Credit category calculation addresses the permanently installed building products that are part of the building's structure, enclosure, and interior elements. These include framing, flooring, insulation, windows, doors, interior walls, ceilings, and finishes. Process equipment, elevators, furniture, and formwork for concrete are not included in the calculation . Reference: LEED v4 Green Associate Candidate Handbook, LEED v4 BD+C Reference Guide


NEW QUESTION # 31
Lighting controls are typically installed in buildings in order to

  • A. improve occupant comfort and save energy throughout the building
  • B. prevent building occupants from making changes to the light levels
  • C. provide a uniform light level across every space in a building
  • D. filter glare produced by overhead fixtures and prevent ultraviolet radiation from reaching building occupants

Answer: A

Explanation:
Lighting controls are devices or systems that can regulate the amount and quality of light in a space according to various factors, such as user preferences, natural light availability, occupancy, and time of day. By doing so, lighting controls can improve occupant comfort and save energy throughout the building. Lighting controls can enhance the visual comfort, well-being, and productivity of the occupants by providing them with appropriate and adjustable light levels for different tasks and moods. Lighting controls can also reduce the energy consumption and environmental impact of the lighting system by avoiding unnecessary or excessive lighting, which can waste electricity, generate heat, and contribute to greenhouse gas emissions. Lighting controls are an essential component of green building design and certification, such as LEED v4, which has adopted ASHRAE Standard 90.1-2010 as the baseline for energy performance and lighting requirements. LEED v4 also recognizes and rewards various lighting control strategies, such as automatic shutoff, light-level reduction, daylight harvesting, exterior lighting control, and plug-load control. Reference: [LEED Link: Minimum Energy Performance], section "LEED v4 BD+C: Minimum Energy Performance"; [LEED Link: Lighting Controls], section "LEED v4 BD+C: Lighting Controls"


NEW QUESTION # 32
Which of the following tools should be used to identify indoor environmental issues and prepare a corrective action plan to make necessary changes?

  • A. Thermal sensors
  • B. Life-cycle assessments
  • C. Mixed-mode design calculations
  • D. Occupant surveys

Answer: D

Explanation:
Explanation
Occupant surveys are tools that can be used to identify indoor environmental issues and prepare a corrective action plan to make necessary changes. Occupant surveys are questionnaires that collect feedback from the building users about their satisfaction, comfort, health, and productivity in relation to the indoor environmental quality (IEQ) factors, such as thermal comfort, indoor air quality, lighting quality, acoustic quality, and occupant control. Occupant surveys can help to identify the sources and causes of IEQ problems, as well as the potential solutions and improvements. Occupant surveys are also required for some LEED credits, such as IEQc7.2 Thermal Comfort, Verification1, which requires a corrective action plan if more than 20% of the occupants are dissatisfied with the thermal conditions in the space2. The other options are not directly related to identifying indoor environmental issues and preparing a corrective action plan, as they involve different types of tools or metrics that are not relevant for measuring occupant satisfaction and comfort.


NEW QUESTION # 33
Which is an example of a low-cost Water Efficiency strategy?

  • A. Install new flush valves or flow restrictors
  • B. Incorporate an on-site blackwater treatment system
  • C. Use only compostable toilets throughout the facility
  • D. Install subsurface cisterns to collect stormwater

Answer: A

Explanation:
Installing new flush valves or flow restrictors is a low-cost strategy to improve water efficiency. These devices reduce the amount of water used in each flush or flow, leading to significant water savings over time.
Other strategies like installing subsurface cisterns to collect stormwater, using only compostable toilets throughout the facility, or incorporating an on-site blackwater treatment system can also improve water efficiency, but they typically involve higher upfront costs. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 34
The LEED Pilot credit library plays an important role in the continuous evolution of LEED by

  • A. developing new credits for U.S. projects only
  • B. limiting the number of times that a credit category appears in the rating system
  • C. achieving the next threshold for exemplary performance
  • D. providing U.S. Green Building Council (USGBC) with feedback on achievability of proposed credits

Answer: D

Explanation:
The LEED Pilot Credit Library is a collection of new credits that are being tested for potential inclusion in future versions of LEED1. The purpose of the library is to allow projects to experiment with innovative strategies and provide feedback to USGBC on their effectiveness, feasibility, and market readiness2. The library also helps USGBC to respond to evolving environmental issues and stakeholder needs2.


NEW QUESTION # 35
The intent of waste management in the Materials and Resources credit category is to

  • A. increase the use of pre-consumer/post-consumer recycled content
  • B. specify the use of green materials
  • C. reduce the amount of waste and toxins hauled to landfills
  • D. promote the use of rapidly renewable resources

Answer: C

Explanation:
Explanation
The intent of waste management in the Materials and Resources credit category is to reduce the amount of waste and toxins hauled to landfills. This can be achieved through strategies such as recycling, composting, reusing materials, and reducing overall material consumption. By reducing waste, we can conserve natural resources, reduce pollution from waste treatment and disposal processes, and decrease the demand for landfill space. References: LEED Green Associate Candidate Handbook, U.S. Green Building Council resources


NEW QUESTION # 36
......

Pass USGBC LEED-Green-Associate Actual Free Exam Q&As Updated Dump: https://www.trainingdumps.com/LEED-Green-Associate_exam-valid-dumps.html

LEED-Green-Associate Exam Info and Free Practice Test All-in-One Exam Guide Mar-2026: https://drive.google.com/open?id=12Fjq-Sr40WYc14RhZfGO0jmhvRDye0He